Tenders

Run a tender and compare contractors

The work package is published on an open website. Contractors submit prices without registering, and you compare them on one basis, with VAT, and pick the winner per item or for the whole lot.

Contractors submit prices without registering, and you compare them on one basis, with VAT.

Open the demo

How a tender goes

From work package to draft contract. Contractors quote in one form, and you compare them line by line.

  1. 1

    Work package

    Items, volumes, starting prices, deadlines and documents

  2. 2

    Publishing

    On the tender site, in Uzbek and Russian

  3. 3

    Requests

    Tax ID, phone, prices per item and the quote file

  4. 4

    Comparison

    Line by line and on one basis, with VAT

  5. 5

    Winner

    Per item or for the whole lot — with a draft contract right away

What tenders can do

Tender site

Contractors quote without registering

The work package is published on the open site tender.pulsedata.uz. A contractor only needs a tax ID, a phone number, prices per item and the quote file. They see their bid’s status via a link — without calling you.

How to bid
tender.pulsedata.uz
UZRUTashqi devorlarni terish, 3-blokNamuna Qurilish · arizalar 30.09 gacha
Gazoblok D500 terish1 850 m³398 000
Peremichkalar o‘rnatish96 dona192 000
KP_Asos_Montaj.pdfAriza yuborish

Separate permissions

The engineer prepares the work package, and the winner is picked by whoever you trust with that.

Urgent packages

For work that can’t wait.

Blacklist

Contractors you no longer work with.

One basis

A price without VAT no longer looks cheaper

Prices with and without VAT are brought to one basis. You see at once who really offers the best price.

D500 aerated block masonryprice per m³
Mustahkam Beton365 000excl. VAT408 800incl. 12% VAT
Asos Montaj398 000incl. VAT398 000best price
Without bringing prices to one basis, 365 000 looks cheaper. On one basis, Asos Montaj wins.
Winner

Pick per line or for the whole lot

Choose the best contractor for each item or one for the whole lot. Every winner gets a draft contract with the tender prices right away.

How contracts work
Mustahkam Beton365 000 excl. VAT408 800 incl. VATAsos Montaj398 000 UZS/m³WinnerTekis Qatlam415 000 UZS/m³tender.pulsedata.uzD500 aerated block masonry · 1 850 m³Starting price 420 000 UZS/m³Tender result−42.3 m UZS · −5.3%

Today vs. with Pulse Data

TodayWith Pulse Data
PricesArrive in all formats: PDF, photos, messagesOne form, prices line by line
VATPrices with and without VAT mixed togetherComparison on one basis
ContractThe winner is picked verbally, the contract written from scratchA draft contract with items and prices from the tender
ContractorsCall to find out who wonSee their bid’s status via a link
Example

The masonry package was published in the morning. By evening three bids sit side by side: Asos Montaj wins the masonry, Mustahkam Beton — the lintels.

Two draft contracts for 752 428 000 UZS — 42 332 000 below the starting prices.

For contractorstender.pulsedata.uzOpen work packages. Quote without registering and track your bid’s status via a link.How to bid

Questions

Didn’t find your answer? We’ll call and explain with examples from your company.

No. A tax ID, phone number, prices per item and the quote file are enough.

Uzbek by default; it can be switched to Russian.

Yes. Or one winner for the whole lot.

Only the employees you’ve given the right to handle bids and pick the winner.

We’ll show it on your tenders

Leave your number — we’ll call and go through your processes. The first month is free.

Open the demo